← Back to Babergh Mid Suffolk Council
Status
Awaiting decision
House extension
Full Proposal
Full Planning Application - Alterations and extensions to the existing house including re-roofing, double bow west extension, a new doric south door case and new east door case and canopy, new single storey link, west extension to cart shed, north extension to cart shed, services (including heat pump installation), drainage and landscaping (including car parking).
Documents
APPLICATION FORM
Application Form
BAT ROOST AND POND ASSESSMENT
Report
BURES ST MARY PARISH COUNCIL RESPONSE
Consultee Comment
CORN HALL FLOOD RISK SUMMARY P1
Report
DESIGN AND ACCESS STATEMENT
Report
EDG 01 AND 02 ELEVATIONS 1252.3.15.P2
Drawing
ENV RESPONSE NOISE ODOUR LIGHT AND SMOKE
Consultee Comment
EXISTING ELEVATIONS 1252.SK.10.2
Drawing
EXISTING FIRST FLOOR PLAN N E AND W ELEVATIONS AND SECTIONS 1257.SK10.2.P1
Drawing
EXISTING GROUND AND FIRST FLOOR PLANS 1252.SK.10.1
Drawing
EXISTING GROUND FLOOR PLAN AND SOUTH ELEVATION 1257.SK10.1.P1
Drawing
EXISTING SITE LAYOUT 18182-1A
Drawing
FLOOD-MAP-PLANNING
Additional Information
HERITAGE STATEMENT
Report
HIGHWAYS RESPONSE
Consultee Comment
HISTORICAL FLOOD RISK
Report
LIVE-IN STAFF ACCOMMODATION REQUIREMENT STATEMENT
Other
LOCATION PLAN 1252.1.1.P5
Drawing
OUTLINE ELEVATIONS 18182.TM.4
Drawing
PROPOSED BASEMENT AND ROOF PLANS 1252.1.26.P2
Drawing
PROPOSED BLOCK PLAN 1252.1.2.P5
Drawing
PROPOSED ELEVATIONS (N. E AND SECTIONS) 1252.1.25.P2
Drawing
PROPOSED ELEVATIONS 1252.1.24.P3
Drawing
PROPOSED ELEVATIONS 1252.1.27.P1
Drawing
PROPOSED FIRST FLOOR PLAN 1252.1.23.P2
Drawing
PROPOSED GROUND FLOOR PLAN
Drawing
PROPOSED GROUND FLOOR PLAN 1252.1.22.P2
Drawing
PROPOSED LANDSCAPE LAYOUT 1252.7.1.P2
Drawing
SCHEDULE OF FIRST FLOOR ALTERATIONS TO EXISTING BUILDING
Report
SCHEDULE OF GROUND FLOOR ALTERATIONS TO EXISTING BUILDING
Report
SURFACE WATER TREATMENT
Additional Information
SURFACE WATER TREATMENT 1252.8.12.P2
Drawing
THE STATUTORY BIODIVERSITY METRIC CALCULATION TOOL
BackGround Papers
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.