Reserved matters application for the approval of appearance, layout and scale for part of the internal road (Phase 1B), to include, drainage works, earth works, construction of electricity substation and other associated works following outline permission S/3440/18/OL
Documents
ACKNOWLEDGEMENT LETTER
Application Officer Correspondence
AIA AND TREE REMOVAL PLAN SHEET 1 OF 6
Drawings
AIA AND TREE REMOVAL PLAN SHEET 2 OF 6
Drawings
AIA AND TREE REMOVAL PLAN SHEET 3 OF 6
Drawings
AIA AND TREE REMOVAL PLAN SHEET 4 OF 6
Drawings
AIA AND TREE REMOVAL PLAN SHEET 5 OF 6
Drawings
AIA AND TREE REMOVAL PLAN SHEET 6 OF 6
Drawings
APPLICATION FORM - NO PERSONAL INFO
Application Information
ARBORICULTURAL IMPACT ASSESSMENT
Application Information
ARBORICULTURAL SURVEY REFERENCE PLAN SHEET 1
Drawings
AREA CALCULATIONS - WLC1400-LC-AC-001 R0
Drawings
ATTENUATION POND DETAILS AND SECTIONS - SHEET 1
Drawings
ATTENUATION POND DETAILS AND SECTIONS - SHEET 2
Drawings
BOURN AIRFIELD CONDITION 35 NOTE
Application Information
CLIMATE, WASTE & ENVIRONMENT
Consultee Comments
CLOSE COUPLED SUBSTATION PYRAMID ROOF DETAILS GA
Drawings
COMMENTS - ECOLOGY OFFICER
Consultee Comments
COND. 41 ? TEMP SURFACE WATER DRAINAGE STRATEGY PH 1B
Application Information
CONDITION 39 ? DETAILED SURFACE WATER STRATEGY PHASE 1B
Application Information
CONSULTEE COMMENT - TREE OFFICER
Consultee Comments
CONSULTEE COMMENTS - ACTIVE TRAVEL ENGLAND
Consultee Comments
CONSULTEE COMMENTS - ANGLIAN WATER
Consultee Comments
CONSULTEE COMMENTS - CCC MINERALS AND WASTE TEAM
Consultee Comments
COVERING LETTER (19.12.2025)
Application Information
DRAINAGE STANDARD DETAILS - SHEET 1
Drawings
DRAINAGE STANDARD DETAILS - SHEET 2
Drawings
EAST WEST RAILWAY
Consultee Comments
ECOLOGY TECHNICAL NOTE PHASE 1B 10.12.2025
Application Information
EIA COMPLIANCE STATEMENT
Application Information
FEE CALCULATION
Application Information
GENERAL ARRANGEMENT
Drawings
GENERAL ARRANGEMENT
Drawings
GENERAL ARRANGEMENT
Drawings
HEADWALL DETAILS
Drawings
LANDSCAPE
Consultee Comments
LOCAL HIGHWAY AUTHORITY
Consultee Comments
MAP OF NOTIFIED NEIGHBOURS
Neighbour/Consultee Notification List
MATERIALS - PHASE 1B
Application Information
METHOD STATEMENT
Application Information
PART 2 - CONDITION 39 ? DETAILED SURFACE WATER STRATEGY
Application Information
PART 3 - CONDITION 39 ? DETAILED SURFACE WATER STRATEGY
Application Information
PHASE 1B CONSTRUCTION ACCESS PLAN
Drawings
PHASE 1B EARTHWORKS PLAN
Drawings
PHASE 1B RED LINE PLAN.
Drawings
PHASE 1B UTILITY DISTRIBUTION
Drawings
PLANNING STATEMENT (19.12.2025)
Application Information
PROPOSED CONSTRUCTION BUILD UPS AND TYPICAL CROSS SECTIONS
Application Information
PROPOSED LAYOUT OF 1B HIGHWAYS SHEET 1
Drawings
PROPOSED LONG SECTION
Drawings
PROPOSED LONGITUDINAL PROFILE SHEET 2
Drawings
PROPOSED ROAD LEVELS
Drawings
PROPOSED ROAD LEVELS
Drawings
PROPOSED SURFACE LEVELS SHEET 3
Drawings
RMA FOUL WATER DRAINAGE - OVERVIEW
Drawings
RMA FOUL WATER DRAINAGE - SHEET 1
Drawings
RMA FOUL WATER DRAINAGE - SHEET 2
Drawings
RMA FOUL WATER DRAINAGE - SHEET 3
Drawings
RMA FOUL WATER DRAINAGE - SHEET 4
Drawings
RMA SURFACE WATER CATCHMENT PLAN - SHEET 1
Drawings
RMA SURFACE WATER CATCHMENT PLAN - SHEET 2
Drawings
RMA SURFACE WATER CATCHMENT PLAN - SHEET 3
Drawings
RMA SURFACE WATER CATCHMENT PLAN OVERVIEW
Drawings
RMA SURFACE WATER DRAINAGE - OVERVIEW
Drawings
RMA SURFACE WATER DRAINAGE - SHEET 1
Drawings
RMA SURFACE WATER DRAINAGE - SHEET 2
Drawings
RMA SURFACE WATER DRAINAGE - SHEET 3
Drawings
RMA SURFACE WATER DRAINAGE - SHEET 4
Drawings
RMA SURFACE WATER DRAINAGE - SHEET 5
Drawings
RMA SURFACE WATER DRAINAGE - SHEET 6
Drawings
RMA SURFACE WATER EXCEEDANCE PLAN - SHEET 1
Drawings
RMA SURFACE WATER EXCEEDANCE PLAN - SHEET 2.
Drawings
SITE NOTICE
Application Press/Site Notices
SITE NOTICE
Application Press/Site Notices
SITE WASTE MANAGEMENT AND MINIMISATION PLAN
Application Information
STREET LIGHTING PLANNING LAYOUT 1 OF 3
Drawings
STREET LIGHTING PLANNING LAYOUT 2
Drawings
STREET LIGHTING PLANNING LAYOUT 3
Drawings
SUBSTATION EARTHING LAYOUT
Drawings
SUSTAINABILITY
Consultee Comments
TECHNICAL BRIEFING NOTE
Application Information
TYPICAL SECTIONS
Drawings
WASTE MANAGEMENT AND MINIMISATION PLAN
Application Information
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.