26/00612/LBC
Cheltenham Borough Council
Status
Pending Consideration
Listed building
Received
15 Apr 2026
New homes
0
Full proposal
Structural bracing of front parapet wall construction using a Cintec Anchor system, the work is required following investigation into the condition of the existing structure and in light of earlier parapet failure in Imperial Square, the works should be completed as a priority to protect the fabric of the building and general public.
Documents
Have your say
Your comment matters. Councils must consider every representation that raises material planning considerations.