← Back to Dacorum Borough Council
Status
With planning case officer
New housing
Full Proposal
Full Planning Application for residential development (Use Class C3) and associated community infrastructure/buildings, green infrastructure, supporting drainage and utilities infrastructure, internal street, footpath and cycle routes, including accesses onto Westwick Row and Green Lane, cycle and car parking, ground works and remodelling and all other associated construction and infrastructure works
Documents
4 bed 7 person - house type c
Proposed Plan
Apartment block ground floor plan
Proposed Floor Plans
Apartment block roof plan
Proposed Elevations
Apartment block typical floor plan
Proposed Floor Plans
Appendix a access and offsite works
Transport Assessment/Statement
Appendix b visibility splays
Transport Assessment/Statement
Appendix c stage 1 road safety audit
Transport Assessment/Statement
Appendix d - vehicle tracking
Transport Assessment/Statement
Appendix e traffic surveys
Transport Assessment/Statement
Application Form
Application Form
Arboricultural impact assessment
Arboriculturial Study
Archaeological assessment part 1
Archaeological Survey
Archaeological assessment part 2.
Archaeological Survey
Biodiversity metric calculation tool
Biodiversity metric calculation tool
Biodiversity metric calculation tool
Biodiversity metric calculation tool
Bng report
Biodiversity statement
Btr central cluster elevations (pl1)
Proposed Elevations
Btr central cluster elevations (pl1).
Proposed Elevations
Btr first floor site layout (pl1)
Proposed Plan
Btr ground floor site layout (pl1)
Proposed Plan
Btr north tynesides elevations
Proposed Elevations
Btr roof site layout (pl1)
Proposed Plan
Btr second floor site layout (pl1)
Proposed Plan
Btr south cluster elevations
Proposed Elevations
Cohousing common house terrace elevations
Proposed Elevations
Cohousing southern terrace elevations
Proposed Elevations
Cohousing square terrace elevations
Proposed Elevations
Common house east-west elevations
Proposed Elevations
Common house east-west elevations
Proposed Elevations
Common house first floor plan.
Proposed Floor Plans
Common house ground floor plan
Proposed Floor Plans
Common house north-south elevations
Proposed Elevations
Document issue sheet
Additional Information
Drawing schedule
Additional Information
Ecology report
Ecological Survey
Energy Statement
Energy Statement
Existing site layout plan
Site & Other Plans
Existing site sections 1 and 2
Section Plans
Existing site sections 3 and 4.
Section Plans
Flood risk assessment and drainage strategy part 1
Flood Risk Assessment
Flood risk assessment and drainage strategy part 2
Flood Risk Assessment
Flood risk assessment and drainage strategy part 3
Flood Risk Assessment
Flood risk assessment and drainage strategy part 4
Flood Risk Assessment
Geo-environmental assessment.
Noise Impact Assessment
Geo-environmental assessment.
Environmental Statement
House type a 2b4p (pl1)
Proposed Plan
House type b 3b6p (pl1)
Proposed Plan
Housing cluster and parking layout
Additional Plans
Housing typologies layout
Proposed Plan
Housing typologies layout first floor
Proposed Floor Plan
Housing typologies layout first floor.
Proposed Plan
Illustrative master plan
Additional Plans
Landscape plan sheet 1 of 2
Landscaping Plan
Landscape plan sheet 1 of 2
Landscaping Plan
Landscaping Plan
Landscaping Plan
Part 1
Transport Assessment/Statement
Part 1
Design & Access Statement
Part 2
Design & Access Statement
Part 2
Transport Assessment/Statement
Part 3
Design & Access Statement
Part 4
Design & Access Statement
Part 5
Design & Access Statement
Part 6
Design & Access Statement
Part 7
Design & Access Statement
Part 8
Design & Access Statement
Part 9
Design & Access Statement
Planning Statement
Planning Statement
Proposed site sections 1 and 2.
Section Plans
Proposed site sections 3 and 4
Section Plans
South cluster elevations (pl1)
Proposed Elevations
Statement of community involvement
Additional Information
Sustainability Statement
Sustainability Statement
Tenure mix plan
Additional Plans
Tyneside m4(3) unit (pl1).
Proposed Plan
Tyneside unit (pl1)
Proposed Plan
Utilities strategy part 1
Utilities Statement
Utilities strategy part 2
Utilities Statement
Utilities strategy part 3
Utilities Statement
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.