← Back to Forest of Dean District Council
P1372/25/FUL
Forest of Dean District Council · IDOX
Status
Consent
Renewable energy
Received
10 Nov 2025
New dwellings
0
Full Proposal
Installation of a small-scale, ground-mounted solar photovoltaic (PV) array in the field immediately north of Underdean House and the installation of a 13.5kWh battery and inverter adjacent to the north wall of the utility room
Documents
A PREVIOUS PROJECT COMMISSIONED BY THE INSTALLER USING THE SAME SYSTEM.
Photographs
Not archived
· Council Link
A PREVIOUS PROJECT COMMISSIONED BY THE INSTALLER USING THE SAME SYSTEM.
Photographs
Not archived
· Council Link
A PREVIOUS PROJECT COMMISSIONED BY THE INSTALLER USING THE SAME SYSTEM.
Photographs
Not archived
· Council Link
A PREVIOUS PROJECT COMMISSIONED BY THE INSTALLER USING THE SAME SYSTEM.
Photographs
Not archived
· Council Link
PHOTOS OF THE REQUIRED TESLA POWERWALL EQUIPMENT TO BE POST MOUNTED OUTSIDE THE
Photographs
Not archived
· Council Link
PHOTOS OF THE REQUIRED TESLA POWERWALL EQUIPMENT TO BE POST MOUNTED OUTSIDE THE
Photographs
Not archived
· Council Link
PROPOSED LOCATION OF POST MOUNTED BATTERY AND INVERTER TO NORTH OF UTILITY ROOM
Photographs
Not archived
· Council Link
VIEW FROM OUTSIDE THE CONSERVATORY AT UNDERDEAN HOUSE LOOKING NORTH TOWARDS THE
Photographs
Not archived
· Council Link
VIEW FROM THE PROPOSED LOCATION OF THE GROUND MOUNTED ARRAY FACING SOUTH TOWARDS
Photographs
Not archived
· Council Link
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.