← Back to Hammersmith & Fulham
Status
Pending Consideration
Change of use
Summary
Change of use from offices to eight residential flats with external alterations, ASHPs and solar panels.
Full Proposal
Change of use of existing buildings from offices (Class E) into 8no self-contained residential flats (Class C3) comprising of 3 x 1 bedroom and 3 x 2 bedroom flat within 'Building A' and 2 x 1 bedroom flats within 'Building B'; external alterations to 'Building A' to include: replacement of existing roof of ground floor rear back addition with a new replacement roof covering including rooflights and 6no air source heat pumps to replace the existing air conditioning units, infilling of the existing front side doors, and installation of new glazed doors to replace the existing glazing at ground floor level to the front elevation; external alterations to 'Building B' to include: installation of 2no air source heat pumps to replace the existing air conditioning units and installation of 8no solar panels at main roof level, installation of a new entrance door opening at the front elevation and replacement of existing window with a new window re-located to the side elevation at ground floor level; conversion of existing garage into bin and cycle storage; associated landscaping.
Documents
(PART 1) PHASE 1 ENVIRONMENTAL SITE ASSESSMENT REPORT
Report
(PART 2) PHASE 1 ENVIRONMENTAL SITE ASSESSMENT REPORT
Report
(PART 3) PHASE 1 ENVIRONMENTAL SITE ASSESSMENT REPORT
Report
(PART 4) PHASE 1 ENVIRONMENTAL SITE ASSESSMENT REPORT
Report
(PART 5) PHASE 1 ENVIRONMENTAL SITE ASSESSMENT REPORT
Report
(PART 6) PHASE 1 ENVIRONMENTAL SITE ASSESSMENT REPORT
Report
(PART 7) PHASE 1 ENVIRONMENTAL SITE ASSESSMENT REPORT
Report
(PART 8) PHASE 1 ENVIRONMENTAL SITE ASSESSMENT REPORT
Report
(SUPERSEDED) FLOOD RISK ASSESSMENT & SURFACE WATER DRAINAGE STRATEGY
Report
(SUPERSEDED) REVISED PROPOSED SITE PLAN
Revised Drawing
(SUPERSEDED) REVISED PROPOSED SITE PLAN
Revised Drawing
(SUPERSEDED) SITE BLOCK PLANS-12.5.25
Drawing
(SUPERSEDED) SITE PLAN - GARAGE ELEVATIONS
Drawing
(SUPERSEDED) SITE REV A
Drawing
ACKNOWLEDGEMENT VALID APPLICATION
Correspondence
ACKNOWLEDGEMENT VALID APPLICATION
Correspondence
APPENDICES TO FRA & SUDS REPORT
Revised Drawing
APPLICATIONFORMREDACTED
Drawing
APPLICATIONFORMREDACTED
Application Form
APPLICATIONFORMREDACTED
Application Form
ATTACHMENTSUMMARY
Drawing
DAYLIGHT AND SUNLIGHT REPORT
Drawing
DAYLIGHT AND SUNLIGHT REPORT
Drawing
FLOOD MANAGEMENT LEAFLET
Drawing
FLOOD RISK ASSESMARG
Report
INVALID LETTER PLANNING APPLICATIONS
Correspondence
INVALID LETTER PLANNING APPLICATIONS
Correspondence
INVALID LETTER PLANNING APPLICATIONS
Correspondence
OFFICER'S FILE NOTE
Report
PLANNING STATEMENT-MARG
Drawing
PLANNING STATEMENT-MARG
Drawing
PLANS - MIDDLE BUILDING B12.5.25
Drawing
PLANS - REAR BUILDING A12.5.25
Drawing
PUBLIC NOTICE
BackGround Papers
REVISED FLOOD RISK ASSESSMENT & SURFACE WATER DRAINAGE STRATEGY
Revised Drawing
REVISED PROPOSED SITE PLAN
Revised Drawing
SITE NOTICE (STANDARD ARTICLE 8)
Correspondence
Take Action