← Back to Hammersmith & Fulham
Status
Pending Consideration
New housing
Full Proposal
Demolition of the existing building with the exception of the front facade; erection of a replacement three storey plus basement single family dwellinghouse; and excavation of the front and rear garden to form lightwells and additional accommodation below rear garden level, in connection with the enlargement of the existing basement.
Documents
0978-1010-PE-FR-RE_P4
Revised Drawing
0978-1011-PE-NW-SE_P2
Revised Drawing
0978-501-DP-SITE_P1
Revised Drawing
0978-502-DP-BS_P0
Revised Drawing
0978-503-DP-GF-1F_P1
Revised Drawing
0978-504-DP-2F-RF_P1
Revised Drawing
0978-510-DE-FR-RE_P0
Revised Drawing
0978-511-DE-NW-SE_P0
Revised Drawing
0978-512-DE-ST_P0
Revised Drawing
0978-513-DS-AA_P1
Revised Drawing
2250010-EGY-ZZ-XX-RP-C-0001 P02 - FLOOD RISK ASSESSMENT
Drawing
ACKNOWLEDGEMENT VALID APPLICATION
Correspondence
ACKNOWLEDGEMENT VALID APPLICATION
Correspondence
AMENDED APPLICATION FORM
Application Form
APPLICATIONFORMREDACTED
Application Form
ELEVATION (REAR) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTING
Drawing
ELEVATION (REAR) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSED
Drawing
ELEVATION (SIDE) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTING
Drawing
ELEVATION (SIDE) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSED
Drawing
FLOOD RISK ASSESSMENT REV.P03
Revised Drawing
FLOOR PLAN - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTING
Drawing
FLOOR PLAN_INCLUDED_IN_ELEVATION (FRONT) - PROPOSED
Drawing
FORM_1_CIL_ADDITIONAL_INFORMATION
Drawing
FORM_2_ASSUMPTION_OF_LIABILITY
Drawing
INVALID LETTER PLANNING APPLICATIONS
Correspondence
INVALID LETTER PLANNING APPLICATIONS
Correspondence
INVALID LETTER PLANNING APPLICATIONS
Correspondence
INVALID LETTER PLANNING APPLICATIONS
Correspondence
JH1942 - BROOMHOUSE ROAD - CONSTRUCTION METHOD STATEMENT 1 OF 5
Drawing
JH1942 - BROOMHOUSE ROAD - CONSTRUCTION METHOD STATEMENT 2 OF 5
Drawing
JH1942 - BROOMHOUSE ROAD - CONSTRUCTION METHOD STATEMENT 3 OF 5
Drawing
JH1942 - BROOMHOUSE ROAD - CONSTRUCTION METHOD STATEMENT 4 OF 5
Drawing
JH1942 - BROOMHOUSE ROAD - CONSTRUCTION METHOD STATEMENT 5 OF 5
Drawing
JH1942 - JHD LETTER OF COMFORT BROOMHOUSE REV C
Drawing
LAYOUT PLAN - PROPOSED_INCLUDED_IN_BLOCK PLAN OF THE SITE
Drawing
ROOF PLAN - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTING
Drawing
ROOF PLAN - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSED
Drawing
SECTION - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTING
Drawing
SECTION - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSED
Drawing
SITE NOTICE (STANDARD ARTICLE 8)
Correspondence
SITE NOTICE (STANDARD ARTICLE 8)
Correspondence
SITEBLOCK PLAN - EXISTING_INCLUDED_IN_LAYOUT PLAN - EXISTING
Drawing
SJC-0978-1003-PP-01-02_P2
Revised Drawing
SJC-0978-1004-PP-RF_P1
Revised Drawing
SJC-0978-2BR-0000-EP-LP
Drawing
SJC-0978-2BR-0001-EXISTING DRAWINGS
Drawing
SJC-0978-2BR-0500-DEMOLITION DRAWINGS
Drawing
SJC-0978-2BR-1000-PP-LP
Drawing
SJC-0978-2BR-1001-PROPOSED DRAWINGS
Drawing
SJC_0978_2BR-1900-DAS
Drawing
SUPEREDED - SJC-0978-2BR-0500-DEMOLITION DRAWINGS
Drawing
SUPERSEDED - SUSTAINABILITY STATEMENT
Drawing
SUSTAINABILITY STATEMENT
Correspondence
SUSTAINABILITY STATEMENT
Drawing
SUSTAINABILITY STATEMENT REV.2
Revised Drawing
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.