Status
Decided
New housing
Summary
Erect three-storey block of five flats and create two flats on Plot A, total seven units.
Full Proposal
Demolition of existing garages on Plot B to allow for the erection of three-storey residential apartment block comprising of 5 units (3 x 2 bed flats and 2 x 3 bed flats) to include basement with storage and service areas. Surface level parking, bin store, bike store, amenity space, associated landscaping and access from Park Road. Redevelopment of middle block approved under application 20/0384/FUL to create 2 x 2 bed units on Plot A.
Documents
Applicationformredacted
Application Form
Arboricultual report
Supporting Documents
Arboriculture response
Consultee replies
Boundary treatment details - north
Drawing/Plans
Boundary treatment details - north
Drawing/Plans
Boundary treatment details - north
Drawing/Plans
Boundary treatment details - north
Drawing/Plans
Boundary treatment details - south
Drawing/Plans
Boundary treatment details - south
Drawing/Plans
Boundary treatment details - west
Amended Plan
Climate change and energy statement
Supporting Documents
Committee report
Committee Report
Construction management plan (highways)
Supporting Documents
Construction route access map
Drawing/Plans
Construction site layout phase 1
Drawing/Plans
Construction site layout phase 2
Drawing/Plans
Consultee comment submitted online
Consultee Comment
Consultee comment submitted online
Consultee Comment
Consultee comment submitted online
Consultee Comment
Consultee comment submitted online
Consultee Comment
Consultee comment submitted online
Consultee Comment
Consultee comment submitted online
Consultee Comment
Consultee comment submitted online
Consultee Comment
Consultee comment submitted online
Consultee Comment
Consultee comment submitted online
Consultee Comment
Daylight, sunlight and overshadowing report
Supporting Documents
Demolition survey
Supporting Documents
Design and access statement v6 feb 2025
Supporting Documents
Desk study & ground investigation
Supporting Documents
Drainage design
Supporting Documents
Dust management and risk assessment
Supporting Documents
Ecology comments
Consultee replies
Existing contextual elevation
Drawing/Plans
Existing garages plans and elevations
Drawing/Plans
Existing site elevation
Amended Plan
Existing site sectional elevation
Amended Plan
Existing urban grain
Drawing/Plans
Flood risk assessment
Supporting Documents
Foundation works method statement
Supporting Documents
Ground investigation report incl uxo
Supporting Documents
Growth and infra response
Consultee replies
Hard surface material details
Supporting Documents
Heritage comments
Consultee replies
Herts fire & rescue response
Consultee replies
Hig comment
Consultee Comment
Highway feasibility report
Supporting Documents
Highways response
Consultee replies
Landscape phase plan
Drawing/Plans
Landscape plan
Drawing/Plans
Landscape plan - earthworks
Drawing/Plans
Landscape plan soft and hard landscaping scheme
Amended Plan
Landscape precedents
Drawing/Plans
Location plan
Drawing/Plans
Paving material specs: hydropave-tegula
Supporting Documents
Photosheet - boundary treatment
Drawing/Plans
Photosheet - boundary treatment
Drawing/Plans
Photosheet boundary treatment
Drawing/Plans
Preliminary ecological appraisal report & biodiversity net gain report
Supporting Documents
Preliminary roost assessment
Supporting Documents
Proposed basement plan
Amended Plan
Proposed bins storage
Amended Plan
Proposed block plan
Drawing/Plans
Proposed contextual elevations
Amended Plan
Proposed cycle store
Drawing/Plans
Proposed ground floor plan
Amended Plan
Proposed landscape plan
Amended Plan
Proposed materiality
Amended Plan
Proposed rear block elevations
Amended Plan
Proposed rear block sectional elevations
Amended Plan
Proposed roof plan
Amended Plan
Proposed second floor plan
Amended Plan
Proposed sectional elevations for terraces
Amended Plan
Proposed site elevation
Amended Plan
Proposed site sectional elevation showing full rear block building
Amended Plan
Proposed urban grain diagram
Amended Plan
Psear response
Consultee replies
Psecc response
Consultee replies
Refuse vehicle swept path analysis
Drawing/Plans
Remediation method statement
Supporting Documents
S106 final draft
Section 106
Statutory metric
Supporting Documents
Thames water response
Consultee replies
Tree protection plan
Drawing/Plans
Watling street and park road - comparison
Supporting Documents
Take Action