← Back to Hertsmere Borough Council
Status
Awaiting decision
Industrial
Summary
Erection of a warehouse with parking and landscaping.
Full Proposal
Erection of a warehouse (Classes E(g)(iii), B2 and B8), including altered access and servicing arrangements, vehicle and bicycle parking, landscaping, and associated works (including the provision of a new substation).
Documents
Acoustics report
Supporting Documents
Air quality assessment
Supporting Documents
Applicationformredacted
Application Form
Bdc waste management
Consultee Comment
Bdc waste management
Consultee Comment
Biodiversity net gain assessment
Supporting Documents
Biodiversity net gain metric
Supporting Documents
Boundary plan
Amended Plan
Cover letter
Supporting Documents
Cycle store
Drawing/Plans
Daylight and sunlight report
Supporting Documents
Design and access statement (1/8)
Supporting Documents
Design and access statement (2/8)
Supporting Documents
Design and access statement (3/8)
Supporting Documents
Design and access statement (4/8)
Supporting Documents
Design and access statement (5/8)
Supporting Documents
Design and access statement (6/8)
Supporting Documents
Design and access statement (7/8)
Supporting Documents
Design and access statement (8/8)
Supporting Documents
Drainage details
Supporting Documents
Drainage details
Supporting Documents
Drainage details
Supporting Documents
Drainage details
Supporting Documents
Drainage details
Supporting Documents
Drainage details
Supporting Documents
Drainage details
Supporting Documents
Drainage details
Supporting Documents
Drainage details
Supporting Documents
Drainage details
Supporting Documents
Ea comments - no objection
Application Form
Ea response
Consultee replies
Ecological assessment
Supporting Documents
Energy and sustainability statement
Supporting Documents
Existing sections
Drawing/Plans
External lighting strategy report
Supporting Documents
Flood / drainage 1in30 yr data
Supporting Documents
Flood risk assessment
Supporting Documents
Hertfordshire fire and rescue service (hydrants only) response annex a
Consultee replies
Herts cc growth and infrastructure (s106) response
Consultee replies
Herts growth and infrastructure response
Consultee replies
Highways response
Consultee replies
Landscaping scheme
Drawing/Plans
Location plan
Drawing/Plans
National highways response
Consultee replies
Office plant area
Drawing/Plans
Phase ii ground investigation report
Supporting Documents
Planning and economic statement
Supporting Documents
Preliminary risk assessment (1/9)
Supporting Documents
Preliminary risk assessment (2/9)
Supporting Documents
Preliminary risk assessment (3/9)
Supporting Documents
Preliminary risk assessment (4/9)
Supporting Documents
Preliminary risk assessment (5/9)
Supporting Documents
Preliminary risk assessment (6/9)
Supporting Documents
Preliminary risk assessment (7/9)
Supporting Documents
Preliminary risk assessment (8/9)
Supporting Documents
Preliminary risk assessment (9/9)
Supporting Documents
Proposed block plan
Drawing/Plans
Proposed elevations
Drawing/Plans
Proposed ground floor plan
Drawing/Plans
Proposed mezzanine
Drawing/Plans
Proposed roof plan
Drawing/Plans
Proposed sections
Drawing/Plans
Sub station
Drawing/Plans
Suds comments
Consultee replies
Suds response
Consultee replies
Surface water drainage strategy
Supporting Documents
Surface water drainage strategy
Supporting Documents
Tfl response
Consultee replies
Thames water response
Consultee replies
Thames water response
Consultee replies
Transport assessment
Supporting Documents
Travel plan
Supporting Documents
Tree survey report
Supporting Documents
Uk power network
Consultee Comment
Uk power network
Consultee Comment
Uk power networks
Consultee Comment
Uk power networks
Consultee Comment
Utilities report
Supporting Documents
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.