Status
Pending Consideration
New housing
Full Proposal
Erection of three storey building to provide 18 no 2-bedroom flats with associated parking and amenity area to rear.
Documents
A SUMMARY OF THE ATTACHMENTS IN THE PROPOSAL
BackGround Papers
ACCESS OFFICER COMMENTS
Correspondence
ACCESS OFFICER COMMENTS
Correspondence
AFFORDABLE HOUSING STATEMENT
BackGround Papers
AGENT EMAIL 19 JUNE 25
Correspondence
AGENT EMAIL 30 OCT 25
Correspondence
AIR QUALITY ASSESSMENT
Report
BIODIVERSITY GAIN PLAN
Other
BIODIVERSITY GAIN PLAN
Other
BIODIVERSITY OFFICER COMMENTS
Correspondence
BNG ASESSMENT SUPPORTING DOCUMENT
Report
BNG ASSESSMENT SUPPORTING DOCUMENT
Drawing
BNG CONDITION ASSESSMENT
BackGround Papers
BNG CONDITION ASSESSMENTS
Drawing
BNG METRIC
Application Form
BUILDING FOR HEALTHY LIFE STATEMENT
BackGround Papers
CHECKSHEET
BackGround Papers
CONSERVATION COMMENTS
Correspondence
DERELICT LAND AT 423-429 ANLABY ROAD
Application Form
DESIGN AND ACCESS STATEMENT
BackGround Papers
E-MAIL FROM AGENT
Correspondence
E-MAIL FROM HIGHWAYS DC
Correspondence
EMAILS TO AGENT 06/08/2025
Correspondence
ENERGY AND SUSTAINABILITY STATEMENT
BackGround Papers
ENVIRONMENT AGENCY COMMENTS
Correspondence
ENVIRONMENT AGENCY COMMENTS
Correspondence
ENVIRONMENTAL PROTECTION COMMENTS
Correspondence
EXISTING EAST FACING ELEVATION
Drawing
EXISTING ELEVATIONS
Drawing
EXISTING ELEVATIONS
Drawing
EXISTING GROUND FLOOR PLAN
Drawing
EXISTING NORTH FACING ELEVATION
Drawing
EXISTING SOUTH FACING ELEVATION
Drawing
FLAT TYPE 1 FLOOR PLAN
Drawing
FLAT TYPE 1 FLOOR PLAN
Drawing
FLAT TYPE 2 FLOOR PLAN
Drawing
FLAT TYPE 2 FLOOR PLAN
Drawing
FLAT TYPE 3 FLOOR PLAN
Drawing
FLAT TYPE 3 FLOOR PLAN
Drawing
FLOOD RISK ASSESSMENT
Report
FLOOD RISK ASSESSMENT (AMENDED)
BackGround Papers
FLOOD RISK SEQUENTIAL TEST
Report
FLOOD TEAM COMMENTS
Correspondence
FLOOR PLANS EXAMPLE
Drawing
FLOOR PLANS EXAMPLE
Drawing
HIGHWAYS COMMENTS
Correspondence
HIGHWAYS DC COMMENTS
Correspondence
HIGHWAYS DC COMMENTS
Correspondence
INVALID EMAIL
Correspondence
NOISE IMPACT ASSESSMENT
Report
OFFICER EMAIL 5 SEP RE RETURNED CONSULT
Correspondence
OPEN SPACE REQUIREMENTS
Correspondence
PHASE 1 DESK STUDY
Report
PRIVATE UNDERGROUND DRAINAGE PLAN
Drawing
PROPOSED EAST ELEVATION W_O FENCING
Drawing
PROPOSED EAST FACING ELEVATION
Drawing
PROPOSED ELEVATIONS
Drawing
PROPOSED ELEVATIONS
Drawing
PROPOSED FIRST FLOOR PLAN
Drawing
PROPOSED GROUND FLOOR PLAN
Drawing
PROPOSED NORTH FACING ELEVATION
Drawing
PROPOSED SECOND FLOOR PLAN
Drawing
PROPOSED SECTIONAL EAST ELEVATION
Drawing
PROPOSED SOUTH ELEVATION W_O FENCING
Drawing
PROPOSED SOUTH FACING ELEVATION
Drawing
PROPOSED STREET ELEVATIONS
Drawing
PROPOSED STREET ELEVATIONS
Drawing
PROPOSED WEST FACING ELEVATION 1
Drawing
PROPOSED WEST FACING ELEVATION 2
Drawing
PUBLIC HEALTH COMMENTS
Correspondence
STATUTORY BNG METRIC
Drawing
TOPOGRAPHICAL SURVEY
Drawing
TRANSPORT ASSESSMENT
Report
TYPICAL FLAT LAYOUT
Drawing
TYPICAL FLAT LAYOUT
Drawing
URBAN DESIGN COMMENTS
Correspondence
YORKSHIRE WATER COMMENTS
Correspondence