Summary
Phased development for data centre and warehouse with infrastructure.
Full Proposal
Hybrid planning application for a phased development seeking full planning permission for development of a data centre campus (Use Class B8), with associated energy, power and water infrastructure, site access and internal roads, site security arrangements, hard and soft landscaping, and other ancillary and auxiliary forms of development; and outline planning permission with all matters reserved save for access, for warehouse and distribution development (Use Class B8) with associated infrastructure inclusive of an EV charging forecourt, car parking and landscaping.
Documents
ARBORICULTURAL REPORT, IMPACT ASSESSMENT & METHOD STATEMENT PART 1
BackGround Papers
Not archived
· Council Link
ARBORICULTURAL REPORT, IMPACT ASSESSMENT & METHOD STATEMENT PART 2
BackGround Papers
Not archived
· Council Link
BUILDING FLOOR PLAN - LEVEL 1 & ROOF PLAN (PLANNING) WATER TREATMENT PLAN
Drawing
Not archived
· Council Link
BUILDING FLOOR PLAN - LEVEL 1 AND ROOF PLAN (PLANNING) SPRINKLER BUILDING
Drawing
Not archived
· Council Link
BUILDING GA ELEVATIONS - SHEET 1 (PLANNING) WATER TREAMTENT PLANT
Drawing
Not archived
· Council Link
ES TA 8.1 FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 1
BackGround Papers
Not archived
· Council Link
ES TA 8.1 FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 2
BackGround Papers
Not archived
· Council Link
ES TA 8.1 FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 3
BackGround Papers
Not archived
· Council Link
ES TA 8.1 FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 4
BackGround Papers
Not archived
· Council Link
ES TA 9.1 DUE DILIGENCE PHASE I DESK STUDY AND PHASE II GEO-ENVIRONMENTAL SITE I
BackGround Papers
Not archived
· Council Link
ES TA 9.1 DUE DILIGENCE PHASE I DESK STUDY AND PHASE II GEO-ENVIRONMENTAL SITE I
BackGround Papers
Not archived
· Council Link
ES TA 9.1 DUE DILIGENCE PHASE I DESK STUDY AND PHASE II GEO-ENVIRONMENTAL SITE I
BackGround Papers
Not archived
· Council Link
ES TA 9.1 DUE DILIGENCE PHASE I DESK STUDY AND PHASE II GEO-ENVIRONMENTAL SITE I
BackGround Papers
Not archived
· Council Link
ES TA 9.1 DUE DILIGENCE PHASE I DESK STUDY AND PHASE II GEO-ENVIRONMENTAL SITE I
BackGround Papers
Not archived
· Council Link
ES TA 9.1 DUE DILIGENCE PHASE I DESK STUDY AND PHASE II GEO-ENVIRONMENTAL SITE I
BackGround Papers
Not archived
· Council Link
ES TA 9.1 DUE DILIGENCE PHASE I DESK STUDY AND PHASE II GEO-ENVIRONMENTAL SITE I
BackGround Papers
Not archived
· Council Link
ES TA 9.1 DUE DILIGENCE PHASE I DESK STUDY AND PHASE II GEO-ENVIRONMENTAL SITE I
BackGround Papers
Not archived
· Council Link
ES TA 9.1 DUE DILIGENCE PHASE I DESK STUDY AND PHASE II GEO-ENVIRONMENTAL SITE I
BackGround Papers
Not archived
· Council Link
ES TA 9.10 REMEDIATION METHOD STATEMENT FORMER KNOSTROP SEWAGE LAGOONS
BackGround Papers
Not archived
· Council Link
ES TA 9.11 FORMER KNOSTROP SEWAGE LAGOONS - COAL MINING RISK ASSESSMENT PART 1
BackGround Papers
Not archived
· Council Link
ES TA 9.11 FORMER KNOSTROP SEWAGE LAGOONS - COAL MINING RISK ASSESSMENT PART 2
BackGround Papers
Not archived
· Council Link
ES TA 9.11 FORMER KNOSTROP SEWAGE LAGOONS - COAL MINING RISK ASSESSMENT PART 3
BackGround Papers
Not archived
· Council Link
ES TA 9.11 FORMER KNOSTROP SEWAGE LAGOONS - COAL MINING RISK ASSESSMENT PART 4
BackGround Papers
Not archived
· Council Link
ES TA 9.11 FORMER KNOSTROP SEWAGE LAGOONS - COAL MINING RISK ASSESSMENT PART 5
BackGround Papers
Not archived
· Council Link
ES TA 9.11 FORMER KNOSTROP SEWAGE LAGOONS - COAL MINING RISK ASSESSMENT PART 6
BackGround Papers
Not archived
· Council Link
ES TA 9.11 FORMER KNOSTROP SEWAGE LAGOONS - COAL MINING RISK ASSESSMENT PART 7
BackGround Papers
Not archived
· Council Link
ES TA 9.11 FORMER KNOSTROP SEWAGE LAGOONS - COAL MINING RISK ASSESSMENT PART 8
BackGround Papers
Not archived
· Council Link
ES TA 9.11 FORMER KNOSTROP SEWAGE LAGOONS - COAL MINING RISK ASSESSMENT PART 9
BackGround Papers
Not archived
· Council Link
ES TA 9.11 FORMER SKELTON GRANGE B POWER STATION - COAL MINING RISK AS. PART 1
BackGround Papers
Not archived
· Council Link
ES TA 9.11 FORMER SKELTON GRANGE B POWER STATION - COAL MINING RISK AS. PART 2
BackGround Papers
Not archived
· Council Link
ES TA 9.11 FORMER SKELTON GRANGE B POWER STATION - COAL MINING RISK AS. PART 3
BackGround Papers
Not archived
· Council Link
ES TA 9.11 FORMER SKELTON GRANGE B POWER STATION - COAL MINING RISK AS. PART 4
BackGround Papers
Not archived
· Council Link
ES TA 9.11 FORMER SKELTON GRANGE B POWER STATION - COAL MINING RISK AS. PART 5
BackGround Papers
Not archived
· Council Link
ES TA 9.11 FORMER SKELTON GRANGE B POWER STATION - COAL MINING RISK AS. PART 6
BackGround Papers
Not archived
· Council Link
ES TA 9.11 FORMER SKELTON GRANGE B POWER STATION - COAL MINING RISK AS. PART 7
BackGround Papers
Not archived
· Council Link
ES TA 9.11 FORMER SKELTON GRANGE B POWER STATION - COAL MINING RISK AS. PART 8
BackGround Papers
Not archived
· Council Link
ES TA 9.11 FORMER SKELTON GRANGE B POWER STATION - COAL MINING RISK AS. PART 9
BackGround Papers
Not archived
· Council Link
ES TA 9.11 GATEWAY 45 - COAL MINING RISK ASSESSMENT PART 1
BackGround Papers
Not archived
· Council Link
ES TA 9.11 GATEWAY 45 - COAL MINING RISK ASSESSMENT PART 2
BackGround Papers
Not archived
· Council Link
ES TA 9.11 GATEWAY 45 - COAL MINING RISK ASSESSMENT PART 3
BackGround Papers
Not archived
· Council Link
ES TA 9.11 GATEWAY 45 - COAL MINING RISK ASSESSMENT PART 4
BackGround Papers
Not archived
· Council Link
ES TA 9.11 GATEWAY 45 - COAL MINING RISK ASSESSMENT PART 5
BackGround Papers
Not archived
· Council Link
ES TA 9.11 GATEWAY 45 - COAL MINING RISK ASSESSMENT PART 6
BackGround Papers
Not archived
· Council Link
ES TA 9.11 GATEWAY 45 - COAL MINING RISK ASSESSMENT PART 7
BackGround Papers
Not archived
· Council Link
ES TA 9.11 GATEWAY 45 - COAL MINING RISK ASSESSMENT PART 8
BackGround Papers
Not archived
· Council Link
ES TA 9.11 GATEWAY 45 - COAL MINING RISK ASSESSMENT PART 9
BackGround Papers
Not archived
· Council Link
ES TA 9.2 PHASE 1 ENVIRONMENTAL SITE ASSESSMENT (ESA) FORMER SKELTON POWER STATI
BackGround Papers
Not archived
· Council Link
ES TA 9.2 PHASE 1 ENVIRONMENTAL SITE ASSESSMENT (ESA) FORMER SKELTON POWER STATI
BackGround Papers
Not archived
· Council Link
ES TA 9.2 PHASE 1 ENVIRONMENTAL SITE ASSESSMENT (ESA) FORMER SKELTON POWER STATI
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 01
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 02
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 03
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 04
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 05
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 06
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 07
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 08
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 09
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 10
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 11
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 12
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 13
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 14
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 15
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 16
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 17
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 18
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 19
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 20
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 21
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 22
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 23
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 24
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 25
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 26
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 27
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 28
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 29
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 30
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 31
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 32
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 33
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 34
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 35
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 36
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 37
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 38
BackGround Papers
Not archived
· Council Link
ES TA 9.3 SUP PHASE 2 GEO-ENVIRO AND GEOTECHNICAL SITE INVESTIGATION PART 39
BackGround Papers
Not archived
· Council Link
ES TA 9.4 GROUND GAS INVESTIGATION AND RISK ASSESSMENT, SKELTON GRANGE POWER STA
BackGround Papers
Not archived
· Council Link
ES TA 9.5 CONTROLLED WATERS DETAILED QUANTITATIVE RISK ASSESSMENT (DQRA) FORMER
BackGround Papers
Not archived
· Council Link
ES TA 9.5 CONTROLLED WATERS DETAILED QUANTITATIVE RISK ASSESSMENT (DQRA) FORMER
BackGround Papers
Not archived
· Council Link
ES TA 9.5 CONTROLLED WATERS DETAILED QUANTITATIVE RISK ASSESSMENT (DQRA) FORMER
BackGround Papers
Not archived
· Council Link
ES TA 9.5 CONTROLLED WATERS DETAILED QUANTITATIVE RISK ASSESSMENT (DQRA) FORMER
BackGround Papers
Not archived
· Council Link
ES TA 9.6 REMEDIATION METHOD STATEMENT FORMER SKELTON B POWER STATION
BackGround Papers
Not archived
· Council Link
ES TA 9.7 PHASE 2 GEO-ENV AND GEOTECHNICAL SITE INVESTIGATION REPORT PART 01
BackGround Papers
Not archived
· Council Link
ES TA 9.7 PHASE 2 GEO-ENV AND GEOTECHNICAL SITE INVESTIGATION REPORT PART 02
BackGround Papers
Not archived
· Council Link
ES TA 9.7 PHASE 2 GEO-ENV AND GEOTECHNICAL SITE INVESTIGATION REPORT PART 03
BackGround Papers
Not archived
· Council Link
ES TA 9.7 PHASE 2 GEO-ENV AND GEOTECHNICAL SITE INVESTIGATION REPORT PART 04
BackGround Papers
Not archived
· Council Link
ES TA 9.7 PHASE 2 GEO-ENV AND GEOTECHNICAL SITE INVESTIGATION REPORT PART 05
BackGround Papers
Not archived
· Council Link
ES TA 9.7 PHASE 2 GEO-ENV AND GEOTECHNICAL SITE INVESTIGATION REPORT PART 06
BackGround Papers
Not archived
· Council Link
ES TA 9.7 PHASE 2 GEO-ENV AND GEOTECHNICAL SITE INVESTIGATION REPORT PART 07
BackGround Papers
Not archived
· Council Link
ES TA 9.7 PHASE 2 GEO-ENV AND GEOTECHNICAL SITE INVESTIGATION REPORT PART 08
BackGround Papers
Not archived
· Council Link
ES TA 9.7 PHASE 2 GEO-ENV AND GEOTECHNICAL SITE INVESTIGATION REPORT PART 09
BackGround Papers
Not archived
· Council Link
ES TA 9.7 PHASE 2 GEO-ENV AND GEOTECHNICAL SITE INVESTIGATION REPORT PART 10
BackGround Papers
Not archived
· Council Link
ES TA 9.7 PHASE 2 GEO-ENV AND GEOTECHNICAL SITE INVESTIGATION REPORT PART 11
BackGround Papers
Not archived
· Council Link
ES TA 9.7 PHASE 2 GEO-ENV AND GEOTECHNICAL SITE INVESTIGATION REPORT PART 12
BackGround Papers
Not archived
· Council Link
ES TA 9.7 PHASE 2 GEO-ENV AND GEOTECHNICAL SITE INVESTIGATION REPORT PART 13
BackGround Papers
Not archived
· Council Link
ES TA 9.8 GROUND GAS INVESTIGATION AND RISK ASSESSMENT, KNOSTROP LAGOONS
BackGround Papers
Not archived
· Council Link
ES TA 9.9 GROUND GAS RECOMMENDATIONS AT SKELTON GRANGE
BackGround Papers
Not archived
· Council Link
FLOOD RISK ASSESSMENT APPENDIX C YORKSHIRE WATER DRAINAGE ASSET
BackGround Papers
Not archived
· Council Link
FLOOD RISK ASSESSMENT APPENDIX D PART 1 LEEDS SFRA MAPS
BackGround Papers
Not archived
· Council Link
FLOOD RISK ASSESSMENT APPENDIX D PART 2 LEEDS SFRA MAPS
BackGround Papers
Not archived
· Council Link
FLOOD RISK ASSESSMENT APPENDIX G GREENFIELD RUNOFF CALCS
BackGround Papers
Not archived
· Council Link
FLOOD RISK ASSESSMENT APPENDIX J DRAINAGE STRATEGY LAYOUT
BackGround Papers
Not archived
· Council Link
FLOOD RISK ASSESSMENT APPENDIX L EXCEEDENCE FLOW RATES
BackGround Papers
Not archived
· Council Link
FLOOD RISK ASSESSMENT APPENDIX M WATER QUALITY TREATMENT LAYOUT
BackGround Papers
Not archived
· Council Link
PLANNING STATEMENT (INCLUDING A STATEMENT OF COMMUNITY INVOLVEMENT)
BackGround Papers
Not archived
· Council Link
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.