← Back to Manchester City Council
Status
Awaiting decision
New housing
Summary
Demolition and redevelopment delivering up to 262 residential dwellings across six buildings with ground-floor commercial.
Full Proposal
Erection of 6 no. residential buildings of 10, 8, 6 and 4 storeys in height to provide up to 262 residential dwellings (Use Class C3) with ground floor commercial uses (Use Class E (a-e)); infrastructure works including electric substation and associated utilities works, basement and ground level car parking, service yard, vehicular and pedestrian accesses; together with public realm works and hard/soft landscaping following the demolition of the existing buildings and structures on site.
Documents
AFFORDABLE HOUSING STATEMENT
Supporting Information
APPLICATION FORM - WITHOUT PERSONAL INFO
Application Form
ARBORICULTURAL IMPACT ASSESSMENT
Tree survey or information
ARBORICULTURAL TECHNICAL NOTE
Tree survey or information
BAY STUDY: BLOCK A & B TYPICAL GROUND FLOOR (BASE)
Drawing - Proposed
BAY STUDY: BLOCK A, B & C TYPICAL LEVEL (BODY)
Drawing - Proposed
BAY STUDY: BLOCK A, B & C TYPICAL UPPER LEVEL (TOP)
Drawing - Proposed
BAY STUDY: BLOCK D, E & F TYPICAL GROUND FLOOR (BASE)
Drawing - Proposed
BAY STUDY: BLOCK D, E & F TYPICAL LEVEL (BODY)
Drawing - Proposed
BAY STUDY: BLOCK D, E & F TYPICAL UPPER LEVEL (TOP)
Drawing - Proposed
BLOCK A&B GROUND FLOOR PLAN
Drawing - Proposed
BLOCK A&B LEVEL 01 PLAN
Drawing - Proposed
BLOCK A&B LEVEL 02-06 PLAN
Drawing - Proposed
BLOCK A&B LEVEL 07 PLAN
Drawing - Proposed
BLOCK A&B LEVEL 08 PLAN
Drawing - Proposed
BLOCK A&B LEVEL 09 PLAN
Drawing - Proposed
BLOCK A&B LEVEL 10 ROOF PLAN
Drawing - Proposed
BLOCK C GROUND FLOOR PLAN
Drawing - Proposed
BLOCK C LEVEL 01 PLAN
Drawing - Proposed
BLOCK C LEVEL 02-05 PLAN
Drawing - Proposed
BLOCK C LEVEL 06 PLAN
Drawing - Proposed
BLOCK C LEVEL 07 ROOF PLAN
Drawing - Proposed
BLOCK D GROUND FLOOR PLAN
Drawing - Proposed
BLOCK D LEVEL 01-03 PLAN
Drawing - Proposed
BLOCK D LEVEL 04-05 PLAN
Drawing - Proposed
BLOCK D LEVEL 06 ROOF PLAN
Drawing - Proposed
BLOCK E GROUND FLOOR PLAN
Drawing - Proposed
BLOCK E LEVEL 01-05 PLAN
Drawing - Proposed
BLOCK E LEVEL 06 ROOF PLAN
Drawing - Proposed
BLOCK F GROUND FLOOR PLAN
Drawing - Proposed
BLOCK F LEVEL 01-03 PLAN
Drawing - Proposed
BLOCK F LEVEL 04 ROOF PLAN
Drawing - Proposed
BNG METRIC
Ecology report
BREEAM PRE-ASSESSMENT REPORT
Supporting Information
CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN
Supporting Information
COVER LETTER
Correspondence
CRIME IMPACT ASSESSMENT
Supporting Information
DAYLIGHT, SUNLIGHT & OVERSHADOWING ASSESSMENT
Daylight & Sunlight assessment
DEMOLITION MANAGEMENT PLAN
Supporting Information
DEMOLITION PHASE ARBORICULTURAL METHOD STATEMENT
Tree survey or information
DESIGN & ACCESS STATEMENT
Design & Access Statement
ECOLOGICAL IMPACT ASSESSMENT
Ecology report
ECONOMIC IMPACT STATEMENT
Supporting Information
ELECTRICITY NW
Consultee Comment
ELEVATION: EAST (FROM BARLOW MOOR ROAD) & EAST (FROM MANCHESTER ROAD)
Drawing - Proposed
ELEVATION: EAST BLOCK A & B BARLOW MOOR ROAD
Drawing - Proposed
ELEVATION: EAST BLOCK A & B PODIUM EAST
Drawing - Proposed
ELEVATION: EAST BLOCK A&B SOUTHERN GABLES
Drawing - Proposed
ELEVATION: EAST BLOCK A, B & C MANCHESTER ROAD EAST
Drawing - Proposed
ELEVATION: EAST BLOCK A, B & C PODIUM EAST
Drawing - Proposed
ELEVATION: EAST BLOCK C NORTH & SOUTH GABLES
Drawing - Proposed
ELEVATION: NORTH (FROM NICOLAS ROAD) & SOUTH (FROM WILBRAHAM ROAD)
Drawing - Proposed
ELEVATION: NORTH BLOCK E
Drawing - Proposed
ELEVATION: SOUTH BLOCK F
Drawing - Proposed
ELEVATION: WEST (FROM MANCHESTER ROAD) & WEST (FROM LANDSCAPED CAR PARK)
Drawing - Proposed
ELEVATION: WEST BLOCK D
Drawing - Proposed
ELEVATIONS: EAST (FROM BARLOW MOOR ROAD) & EAST (FROM MANCHESTER ROAD)
Drawing - Existing
ELEVATIONS: NORTH (FROM NICOLAS ROAD) & SOUTH (FROM WILBRAHAM ROAD)
Drawing - Existing
ELEVATIONS: WEST (FROM MANCHESTER ROAD)
Drawing - Existing
EMBODIED CARBON ASSESSMENT
Supporting Information
EMBODIED CARBON TECHNICAL NOTE
Supporting Information
ENERGY & SUSTAINABLE DESIGN STATEMENT
Supporting Information
ENV AGENCY
Consultee Comment
ENV AGENCY
Consultee Comment
ES VOL 1 MAIN REPORT
Environmental Statement
ES VOL 2 TECHNICAL APPENDICES
Environmental Statement
ES VOL 3 NON-TECHNICAL SUMMARY
Environmental Statement
FINANCIAL VIABILITY APPRAISAL
Supporting Information
FIRE STATEMENT
Supporting Information
FIRE STATEMENT GA PLAN 01
Supporting Information
FIRE STATEMENT GA PLAN 02
Supporting Information
FLOOD RISK ASSESSMENT
Flood Risk Assessment or Drainage
GA BASEMENT PLAN
Drawing - Proposed
GA GROUND FLOOR PLAN
Drawing - Proposed
GA LEVEL 01 PLAN
Drawing - Proposed
GA LEVEL 02 PLAN
Drawing - Proposed
GA LEVEL 03 PLAN
Drawing - Proposed
GA LEVEL 04 PLAN
Drawing - Proposed
GA LEVEL 05 PLAN
Drawing - Proposed
GA LEVEL 06 PLAN
Drawing - Proposed
GA LEVEL 07 PLAN
Drawing - Proposed
GA LEVEL 08 PLAN
Drawing - Proposed
GA LEVEL 09 PLAN
Drawing - Proposed
GA LEVEL 10 PLAN
Drawing - Proposed
GA PLAN
Drawing - Existing
HEALTH IMPACT ASSESSMENT
Supporting Information
LANDSCAPE GROUND FLOOR GA
Drawing - Proposed
LANDSCAPE LEVELS & DRAINAGE PLAN
Drawing - Proposed
LANDSCAPE MASTERPLAN
Drawing - Proposed
LIGHTING IMPACT ASSESSMENT
Supporting Information
LOCATION PLAN
Drawing - Location Plan
MAN AIRPORT
Consultee Comment
MAN AIRPORT
Consultee Comment
MCC ARBORICULTURAL TEAM
Consultee Comment
MCC ARBORICULTURAL TEAM
Consultee Comment
MCC ARBORICULTURAL TEAM
Consultee Comment
MCC ENV HEALTH
Consultee Comment
MCC ENV HEALTH
Consultee Comment
MCC ENV HEALTH
Consultee Comment
MCC ENV HEALTH
Consultee Comment
MCC ENV HEALTH
Consultee Comment
MCC ENV HEALTH
Consultee Comment
MCC FLOOD RISK MANAGEMENT
Consultee Comment
MCC FLOOD RISK MANAGEMENT
Consultee Comment
MCC HIGHWAYS
Consultee Comment
MCC HIGHWAYS
Consultee Comment
MCC HIGHWAYS
Consultee Comment
NATURAL ENGLAND
Consultee Comment
NATURAL ENGLAND
Consultee Comment
OBJECTS (REDACTED-FURTHER NON PA COMMENTS)
Public Comment
OBJECTS (REDACTED-NON PA COMMENTS 1ST NOTIFICATION)
Public Comment
OBJECTS (REDACTED-NON PA COMMENTS RENOTIFICATION)
Public Comment
PHASE 1 DESK STUDY
Ground Survey
PLANNING STATEMENT
Supporting Information
PODIUM COURTYARD GARDEN GA
Drawing - Proposed
RETAIL OCCUPIER STRATEGY
Supporting Information
SECTIONS
Drawing - Existing
SECTIONS
Drawing - Proposed
SITE INVESTIGATION CALIBRATION CERTIFICATE
Ground Survey
SITE INVESTIGATION REPORT & REMEDIATION STRATEGY
Ground Survey
SOFT LANDSCAPE PLAN
Drawing - Proposed
STATEMENT OF COMMUNITY INVOLVEMENT
Supporting Information
SUBSTATION WEST
Drawing - Proposed
SUPPORT (REDACTED-NON PA COMMENTS RENOTIFICATION)
Public Comment
SUPPORTS (REDACTED-FURTHER NON PA COMMENTS)
Public Comment
TRAFFORD COUNCIL
Consultee Comment
TRAFFORD COUNCIL
Consultee Comment
TV RECEPTION STUDY
Supporting Information
UTILITIES STATEMENT
Supporting Information
VENTILATION STATEMENT
Supporting Information
WIND MICROCLIMATE STUDY
Supporting Information