← Back to Mid Sussex District Council
Status
Pending Consideration
New housing
Full Proposal
Demolition of existing dwelling and commercial building, with the erection of 4 x 4 Bedroomed Houses and 2 x 5 Bedroomed Houses
Documents
Application Form
Application form
Arboricultural Impact Assessment Arbtech AIA 03
Latest plan
Arboricultural Method Statement
Supporting statement
Biodiversity Gain Plan Form
Supporting statement
Biodiversity Net Gain Statement
Supporting statement
Bolney Parish Council
Consultation response
Contaminated Land
Consultation response
Design and Access Statement
Design and Access Statement
Drainage Strategy
Supporting statement
EIA Checklist
Site notes and file notes
Energy (and Sustainability) Statement
Supporting statement
Existing Buildings Plans & Elevations 402.BBHH.103
Latest plan
Existing Location and Block Plan 402.BBHH.100
Latest plan
Flood Risk Assessment
Supporting statement
Highways, Refuse, Recycling, Cycle Storage and Drainage Layout 402.BBHH.102 Rev B
Latest plan
House Type 1 402.BBHH.110
Latest plan
House Type 2 402.BBHH.111
Latest plan
House Type 3 402.BBHH.112
Latest plan
MSDC Drainage - further info required
Consultation response
MSDC Neighbour Notification List
Site notes and file notes
MSDC Street Naming and Numbering
Consultation response
MSDC Tree Officer
Consultation response
Place Services
Consultation response
Pre and Post Development Plan Maps
Latest plan
Proposed Site Layout 402.BBHH.101 Rev D
Latest plan
Response from Drainage consultant
Correspondence
Schedule of External Materials
Supporting statement
Site Notice
Site notes and file notes
Small Sites Metric (The Statutory Biodiversity Metric)
Supporting statement
Tree Protection Plan - Arbtech TPP 03 Demo
Latest plan
Tree Protection Plan - Construction Arbtech TPP 03 Con
Latest plan
Water Efficiency Calculator
Supporting statement
Wellmead Cottage London Road Bolney
Representation letter
Wellmead East London Road Bolney
Representation letter
WSCC Highways
Consultation response
WSCC Minerals and Waste
Consultation response
WSCC Section 106
Consultation response
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.