← Back to North Somerset Council
Status
Awaiting decision
New housing
Full Proposal
Outline planning application, with all matters reserved for subsequent approval except for means of access, for the erection of up to 75no. dwellings, public open space, landscaping, sustainable urban drainage system and engineering works, with vehicular access off Ladymead Lane
Documents
1748-09-B - PROPOSED 20MPH SPEED LIMITS
Plan
1748-10-B - 20MPH AND TRAFFIC CALMING SCHEME
Plan
1748-SP-11-A - SWEPT PATH ANALYSIS REFUSE VEHICLE ENTERING SITE
Plan
1748-SP-12-A - SWEPT PATH ANALYSIS REFUSE VEHICLE DEPARTING SITE SITE
Plan
ACTIVE TRAVEL ENGLAND COMMENTS
Consultation Reply
AFFORDABLE HOUSING
Consultation Reply
APPENDIX 1 - HEP LH V4
Ecological report
APPENDIX 2 - HEP GH V4
Ecological report
APPENDIX 3 - STATUTORY BNG METRIC 20-05-25_OUTLINE PROPOSALS
Ecological report
APPLICATION FORM REDACTED (AMENDED)
Amended Application Form
ARBORICULTURAL SURVEY
Arboricultural statement
ARCHAEOLOGICAL EVALUATION REPORT
Report
ARCHAEOLOGICAL WRITTEN SCHEME OF INVESTIGATION VERSION 2
Report
ARCHAEOLOGY COMMENTS
Consultation Reply
AVON FIRE & RESCUE - FIRE HYDRANT REQUIREMENTS
Consultee Comment
AVON FIRE & RESCUE - LETTER OF INTEREST
Consultee Comment
BIODIVERSITY NET GAIN METRIC
Ecological report
BIODIVERSITY NET GAIN METRIC TOOL
Report
BIODIVERSITY NET GAIN REPORT INC BASELINE HABITAT PLAN
Ecological report
COVERING LETTER FROM AGENT
Letter from Agent
CRIME PREVENTION TEAM COMMENTS
Consultation Reply
DESIGN AND ACCESS STATEMENT
Design and access statement
DESIGNERS RESPONSE REPORT TO STAGE 1 ROAD SAFETY AUDIT
Report
DRAINAGE TECHNICAL NOTE
Flood risk assessment
ECOLOGICAL IMPACT ASSESSMENT
Ecological report
ECOLOGY TECHNICAL NOTE
Ecological report
ECOLOGY TECHNICAL NOTE
Report
ELECTRICAL CABLE CALCULATION
Plan
ENERGY AND SUSTAINABILITY STATEMENT
Energy Statement
ENVIRONMENT AGENCY
Consultation Reply
ENVIRONMENTAL PROTECTION TEAM COMMENTS
Consultation Reply
EXISTING SITE LAYOUT PLAN
Plan
FLOOD RISK ASSESSMENT - APPENDICIES A AND B
Flood risk assessment
FLOOD RISK ASSESSMENT - APPENDICIES E AND F
Flood risk assessment
FLOOD RISK ASSESSMENT - APPENDIX C
Flood risk assessment
FLOOD RISK MANAGEMENT COMMENT 18/11/25
Email
FLOOD RISK MANAGEMENT COMMENTS
Consultation Reply
FLOODRISK ASSESSMENT - APPENDIX D
Flood risk assessment
FOOTPATH PRIVATE BOLLARD DESIGN
Plan
FOOTPATH PRIVATE BOLLARD DESIGN ELECTRICAL
Plan
FRA APPENDICES - REV B
Flood risk assessment
FRA APPENDICES A-F REV D
Flood risk assessment
FRA APPENDIX G REV D
Flood risk assessment
FRAMEWORK PARAMETER PLAN
Plan
FRAMEWORK PARAMETER PLAN
Amended Plan
FRAMEWORK PARAMETER PLAN
Amended Plan
HABITATS REGULATIONS ASSESSMENT
Ecological report
HEDGEROW REMOVAL PLAN (1 OF 2)
Plan
HEDGEROW REMOVAL PLAN (2 OF 2)
Plan
HIGHWAY ELECTRICAL AND ITS
Consultation Reply
HISTORIC ENVIRONMENT DESK-BASED ASSESSMENT
Heritage statement
HTDM COMMENTS
Consultation Reply
HTDM COMMENTS
Consultation Reply
HTDM COMMENTS
Consultation Reply
HTDM COMMENTS ADDENDUM
Consultation Reply
IDB COMMENTS
Consultation Reply
ILLUSTRATIVE MASTERPLAN
Amended Plan
INTERNAL DRAINAGE BOARD COMMENTS
Consultation Reply
INTERNAL DRAINAGE BOARD COMMENTS
Consultation Reply
LADYMEAD_CONSULTEE TRACKER_V5
Application Support Info
LANDSCAPE & VISUAL IMPACT ASSESSMENT - APPENDICIES 4, 5, 6 AND 7
Landscape & Visual Impact Assessment
LANDSCAPE & VISUAL IMPACT ASSESSMENT - APPENDIX 3
Landscape & Visual Impact Assessment
LANDSCAPE & VISUAL IMPACT ASSESSMENT - PART 1
Landscape & Visual Impact Assessment
LIGHTING COMMENT 25/06/25
Email
LIGHTING DESIGN RISK ASSESSMENT
Lighting assessment
LIGHTING SCHEDULE
Lighting assessment
LLFA COMMENTS
Consultation Reply
LLFA COMMENTS
Consultation Reply
NATURAL ENGLAND COMMENTS
Consultation Reply
OUTDOOR LIGHTING REPORT
Lighting assessment
OUTDOOR LIGHTING REPORT
Report
OUTDOOR LIGHTING REPORT
Report
PHASE 1 DESK STUDY - APPENDIX B
Report
PHASE 1 DESK STUDY - APPENDIX C, PART 1
Report
PHASE 1 DESK STUDY - APPENDIX C, PART 2
Report
PHASE 1 DESK STUDY - REPORT & APPENDIX A
Report
PHASE 1 DESK STUDY REPORT - APPENDICIES C, PART 3 AND D
Report
PLAN - S38 STREET LIGHTING DESIGN
Lighting assessment
PLANNING DESIGN COMMENTS
Report
PLANNING STATEMENT
Planning Statement
PRESS ADVERT LIST FOR 28/11/24
Press Advert
PRO-FORMA FOR SECTION 106
Other
PROPOSED EQUIPMENT SCHEDULE
Other
PROPOSED EQUIPMENT SCHEDULE
Other
REV B
Flood risk assessment
REV D
Flood risk assessment
RL 101 - TN01 - P1 DRAINAGE TECHNICAL NOTE
Report
RL101 120E ILLUSTRATIVE MASTERPLAN
Amended Plan
RL101 PLANNING DESIGN COMMENTS_V2
Application Support Info
RL101-500-P5-DRAINAGE STRATEGY
Plan
RL101-501-P5-DRAINAGE STRATEGY
Plan
S278 STREET LIGHTING DESIGN
Plan
SCHEDULE OF PLANS AND REPORTS
Other
STAGE 1 ROAD SAFETY AUDIT
Report
STATEMENT OF COMMUNITY INVOLVEMENT
Report
STREET LIGHTING DESIGN RISK ASSESSMENT
Report
STREET LIGHTING DESIGN RISK ASSESSMENT
Report
SUBMISSION CHECKLIST
Application Support Info
SUBMISSION CHECKLIST [JULY 2025]
Other
SUBMISSION CHECKLIST_UPDATED JUNE 2025
Other
SUBMISSION CHECKLIST_UPDATED NOVEMBER 2025
Other
SUPERSEDED DRAINAGE STRATEGY - SHEET 1 OF 2
Plan
SUPERSEDED DRAINAGE STRATEGY SHEET 2 OF 2
Plan
SUPERSEDED FLOOD RISK ASSESSMENT
Flood risk assessment
SUPERSEDED ILLUSTRATIVE MASTERPLAN
Plan
SUPERSEDED LADYMEAD LANE 20MPH AND TRAFFIC CALMING SCHEME
Plan
SUPERSEDED PROPOSED 20MPH SPEED LIMITS
Plan
SUPERSEDED RL101-500-P3 - DRAINAGE STRATEGY SHEET 1
Amended Plan
SUPERSEDED RL101-501-P3 - DRAINAGE STRATEGY SHEET 2
Amended Plan
SUPERSEDED SWEPT PATH ANALYSIS: REFUSE VEHICLE DEPARTING THE SITE
Plan
SUPERSEDED SWEPT PATH ANALYSIS: REFUSE VEHICLE ENTERING THE SITE
Plan
SUPERSEDED TRANSPORT ASSESSMENT
TRANSPORT ASSESSMENT
SUPERSEDED TRAVEL PLAN
Travel plan
SWEPT PATH ANALYSIS - REFUSE VEHICLE
Plan
SWEPT PATH ANALYSIS - REFUSE VEHICLE & ESTATE CAR
Plan
SWEPT PATH ANALYSIS: PASSING PLACES REFUSE VEHICLE
Plan
SWEPT PATH ANALYSIS: REFUSE VEHICLE & ESTATE CAR
Plan
TRANSPORT ASSESSMENT [JULY 2025]
Report
TRAVEL PLAN [JULY 2025]
Report
TREE OFFICER COMMENT 28/11/24
Consultation Reply
UPDATED ECOLOGY COMMENTS
Consultation Reply
URBAN DESIGN COMMENTS
Consultation Reply
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.