← Back to Stroud District Council
Summary
Convert listed building range and build new units to provide a total of 34 homes.
Full Proposal
Conversion of existing listed building range into residential dwellings (C3) and the construction of new dwellings to total 34no homes. Includes the demolition to portion of roof structure and some ancillary structures. Resubmission of S.22/2746/LBC.
Documents
ADDENDUM TO APPROVED D & A STATEMENT
Report
APPLICATION FORM - WITHOUT PERSONAL DATA
Application Form
BAT ACTIVITY SURVEY
Supporting Document
BAT ROOST MITIGATION
Drawing
BLOCK C DETAILS 4
Drawing
BLOCK D DETAILS 2
Drawing
BLOCK D DETAILS 3
Drawing
BLOCK E DETAILS 1
Drawing
BLOCK F DETAILS 1
Drawing
DEMOLITION ELEVATIONS 1
Drawing
DEMOLITION ELEVATIONS 2
Drawing
DEMOLITION ELEVATIONS 3
Drawing
DESIGN AND ACCESS STATEMENT
Design and Access Statement
DEV PROPOSAL & SCHEME SUMMARY
Report
DEV PROPOSAL - EAST WING
Drawing
DEV PROPOSAL - MILL BUILDING
Drawing
DEV PROPOSAL - WEST WING
Drawing
EXISTING & PROPOSED ROOF PLAN
Drawing
EXISTING COURTYARD ELEVATIONS
Drawing
EXISTING EAST ELEVATION EBLEY MILL VIEW B-B
Drawing
EXISTING FIRST FLOOR PLAN
Drawing
EXISTING FOURTH FLOOR PLAN
Drawing
EXISTING GROUND FLOOR PLAN
Drawing
EXISTING NORTH ELEVATION CANAL VIEW A-A
Drawing
EXISTING SECOND FLOOR PLAN
Drawing
EXISTING SECTIONS
Drawing
EXISTING SITE SECTIONS
Drawing
EXISTING SOUTH ELEVATION CAR PARK VIEW C-C / D-D
Drawing
EXISTING THIRD FLOOR PLAN
Drawing
EXISTING WEST ELEVATION BRIDGE VIEW E-E / F-F
Drawing
FIRST FLOOR DEMOLITION PLAN
Drawing
GENERAL STAIRCASE - DETAILS 2
Drawing
GROUND FLOOR DEMOLITION PLAN
Drawing
HERITAGE STATEMENT
Report
HISTORIC ENGLAND
Consultee Comment
INITIAL JOINERY - DETAILS 1
Drawing
MATERIALS SCHEDULE
Report
PARISH CONSULTATION LETTER WEB
Correspondence
PROPOSED BIKE STORE & BIN STORE C
Drawing
PROPOSED BOUNDARY TREATMENTS
Drawing
PROPOSED EAST ELEVATIONS
Drawing
PROPOSED FIRST FLOOR PLAN
Drawing
PROPOSED FLUE POSITIONS (EAST)
Drawing
PROPOSED FLUE POSITIONS (NORTH)
Drawing
PROPOSED FLUE POSITIONS (SOUTH)
Drawing
PROPOSED FLUE POSITIONS (WEST)
Drawing
PROPOSED FOURTH FLOOR PLAN
Drawing
PROPOSED GARAGES & BIN STORES D,E,F
Drawing
PROPOSED GROUND FLOOR PLAN
Drawing
PROPOSED NEW-BUILD EAST ELEVATIONS
Drawing
PROPOSED NEW-BUILD FIRST FLOOR PLAN
Drawing
PROPOSED NEW-BUILD GROUND FLOOR PLAN
Drawing
PROPOSED NEW-BUILD NORTH ELEVATION
Drawing
PROPOSED NEW-BUILD ROOF PLAN
Drawing
PROPOSED NEW-BUILD SECOND FLOOR PLAN
Drawing
PROPOSED NEW-BUILD SOUTH ELEVATION
Drawing
PROPOSED NEW-BUILD WEST ELEVATIONS
Drawing
PROPOSED NORTH ELEVATIONS
Drawing
PROPOSED REFUSE PLAN
Drawing
PROPOSED SECOND FLOOR PLAN
Drawing
PROPOSED SITE EXTERNAL WORKS
Drawing
PROPOSED SOUTH ELEVATIONS
Drawing
PROPOSED THIRD FLOOR PLAN
Drawing
PROPOSED WEST ELEVATIONS
Drawing
SECOND-FOURTH FLOOR DEMOLITION PLAN
Drawing
SITE NOTICE NOV 17
Correspondence
STANDARD CONSULTATION VIA EMAIL
Correspondence
STANDARD CONSULTATION VIA EMAIL
Correspondence
STANDARD CONSULTATION VIA EMAIL
Correspondence
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.