← Back to Thurrock Council
Full Proposal
Construction and operation use of an empty shipping container storage building (use class B8) within London Gateway Port with associated office/storage buildings, HGV/shuttle carrier interchanges, access roadways/walkways, drainage facilites, lighting, boundary treatments and utility connections.
Documents
ANCILARY OFFICE AND STORE PLAN SECTIONS
Current Plan
ANGLIAN WATER
Consultee Comment
APPLICATION FORM
Application Form
ARCHAEOLOGICAL PROJECT DESIGN (APD)
Studies and Reports
BOUNDARY TREATMENT AND STREET FURNITURE
Current Plan
Committee Report
Committee Report
CONTAMINATED LAND SURVEY
Studies and Reports
COVER LETTER
Cover Letter
Decision Notice
Decision Notice
DESIGN AND ACCESS STATEMENT
Studies and Reports
DRAINAGE LAYOUT
Current Plan
EMERGENCY PLANNING
Consultee Comment
ENERGY AND WATER STATEMENT
Studies and Reports
ENVIRONMENT AGENCY
Consultee Comment
ENVIRONMENTAL HEALTH
Consultee Comment
EXISTING BLOCK PLAN
Current Plan
FLOOD RISK ASSESSMENT
Superseded
FLOOD RISK ASSESSMENT
Studies and Reports
HARD LANDSCAPING
Current Plan
INFORMATION TO INFORM HABITATS REGULATIONS ASSESSMENT SCREENING
Studies and Reports
LIGHTING - CU PHOSCO DATASHEET - FL820 AREA (2).
Studies and Reports
NATIONAL GAS
Consultee Comment
NATIONAL HIGHWAYS
Consultee Comment
NATURAL ENGLAND 1 OF 2
Consultee Comment
NATURAL ENGLAND 2 OF 2
Consultee Comment
PLANNING STATEMENT
Studies and Reports
PORT OF LONDON AUTHORITY
Consultee Comment
PROPOSED GROUND FLOOR PLAN
Current Plan
SITE LAYOUT PLAN
Current Plan
UTILITY CONNECTIONS
Current Plan
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.