Use of the building as commercial, business and service (Class E); external alternations comprising a new office entrance, shopfront and replacement windows; installation of replacement plant equipment, PV panels, mansafe system and roof lights.
Documents
ACK-GENERAL LETTER (G/P/C)
Background Papers
APPLICATIONFORMREDACTED
Application Form
CNSLT-LA SOCIETY
Background Papers
CNSLT-LA SOCIETY
Background Papers
DEMOLITION FRONT ELEVATION
Drawing
DEMOLITION REAR ELEVATION 1
Drawing
DEMOLITION REAR ELEVATION 2
Drawing
DEMOLITION SECTION A-A -
Drawing
DEMOLITION SECTION B-B -
Drawing
DESIGN AND ACCESS STATEMENT
Design and Access Statement
DESIGN AND ACCESS STATEMENT ISSUE 03
Design and Access Statement
ECNSLT-INTERNAL CONSULTS
Background Papers
ECNSLT-INTERNAL CONSULTS
Background Papers
EXISTING FRONT ELEVATION
Drawing
EXISTING FRONT ELEVATION
Drawing
EXISTING REAR ELEVATION 1
Drawing
EXISTING REAR ELEVATION 2
Drawing
EXISTING SECTION A-A-
Drawing
EXISTING SECTION B-B
Drawing
FIRST FLOOR EXISTING PLAN
Drawing
FIRST FLOOR GENERAL ARRANGEMENT PLAN
Drawing
FLORAL STREET DRAWING ISSUE
Background Papers
FLORAL STREET DRAWING ISSUE
Background Papers
FLORAL STREET SURVEY
Background Papers
FOURTH FLOOR EXISTING PLAN
Drawing
FOURTH FLOOR GENERAL ARRANGEMENT PLAN
Drawing
GROUND FLOOR EXISTING PLAN
Drawing
GROUND FLOOR GENERAL ARRANGEMENT PLAN
Drawing
GROUND FLOOR GENERAL ARRANGEMENT PLAN-
Drawing
LOCATION PLAN
Location Plan
LOWER GROUND FLOOR EXISTING PLAN
Drawing
LOWER GROUND FLOOR GENERAL ARRANGEMENT-
Drawing
MAIN ENTRANCE - DETAILED ELEVATION
Drawing
MAIN ENTRANCE DETAILED ELEVATION
Drawing
NATURAL SMOKE VENTING LETTER
Background Papers
NEIGHBOUR NOTIFICATION LETTER (21D)
Background Papers
NOISE ASSESSMENT
Noise impact assessment
NORTH ELEVATION -PROPOSED SASH WINDOWS
Drawing
NORTH ELEVATION PROPOSED SASH WINDOW
Drawing
NORTH ELEVATION PROPOSED SIGNAGE DETAILS
Drawing
PAVEMENT SMOKE VENT SETTING OUT
Drawing
PLANNING AND HERITAGE COVER LETTER INCLUDING BNG
Background Papers
PROPOSED FENCE DETAILS
Drawing
PROPOSED FRONT ELEVATION
Drawing
PROPOSED FRONT ELEVATION
Drawing
PROPOSED NORTH ELEVATION RENDER WALL DETAILS -
Drawing
PROPOSED NORTH ELEVATION RENDER WALL PLAN DETAILS
Drawing
PROPOSED REAR ELEVATION 1
Drawing
PROPOSED REAR ELEVATION 2
Drawing
PROPOSED SECTION A-A
Drawing
PROPOSED SECTION B-B
Drawing
RECEIPT OF APPLICATION
Other
ROOF LEVEL EXISTING PLAN
Drawing
ROOF LEVEL GENERAL ARRANGEMENT PLAN
Drawing
SECOND FLOOR EXISTING PLAN
Drawing
SECOND FLOOR GENERAL ARRANGEMENT PLAN
Drawing
SITE NOTICE 21 OR 28 DAYS IF T&C APPL.
Background Papers
THIRD FLOOR EXISTING PLAN
Drawing
THIRD FLOOR GENERAL ARRANGEMENT PLAN
Drawing
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.