Partial demolition, basement excavation and works to create one three‑bedroom residential unit (Class C3).
Full Proposal
Partial demolition; basement excavation; replacement ground floor frontage; creation of a rear lightwell; installation of a new window on the west elevation; and associated external works in connection with residential use of part of the ground floor and new basement floor as one three bedroom unit (Class C3). (Land use swap with 20 Upper Grosvenor Street (REF: 25/06740/FULL))
Documents
1. DESIGN AND ACCESS STATEMENT
Design and Access Statement
10. DRAINAGE STRATEGY
Background Papers
11. HERITAGE STATEMENT
Heritage Statement
12. STRUCTURAL METHOD STATEMENT
Structural survey
13. SUSTAINABLE DESIGN STATEMENT
Sustainability appraisal
15. 21 LEES PLACE BUSINESS RATES DETAILS
Background Papers
16. 21 LEES PLACE MARKETING PARTICULARS
Background Papers
17. COVERING LETTER
Background Papers
18A - DEMOLITION - EXISTING GROUND FLOOR PLAN
Drawing
18B - DEMOLITION EXISTING FIRST FLOOR PLAN
Drawing
18C - DEMOLITION - EXISTING SECTION A-A
Drawing
18D - DEMOLITION EXISTING FRONT ELEVATION
Drawing
18E - DEMOLITION EXISTING SECTION C-C
Drawing
18F - LOCATION PLAN
Location Plan
18G - EXISTING GROUND FLOOR PLAN
Drawing
18H - EXISTING FIRST FLOOR PLAN
Drawing
18J- EXISTING SECTION C-C AND WESTERN ELEVATION
Drawing
18K - EXISTING FRONT ELEVATION
Drawing
18L - EXISTING SECTION A-A
Drawing
18M - PROPOSED GROUND FLOOR PLAN
Drawing
18N - PROPOSED FIRST FLOOR PLAN
Drawing
18O PROPOSED FRONT ELEVATION.PDF
Drawing
18P PROPOSED LOWER GROUND FLOOR PLAN
Drawing
18Q PROPOSED SECTION CC AND WESTERN ELEVATION
Drawing
18R PROPOSED SECTIONS A AND D AND E
Drawing
2. ARCHAEOLOGICAL DESK BASED ASSESSMENT
Background Papers
3. BASEMENT IMPACT ASSESSMENT_OPT
Background Papers
4. PHASE I DESK STUDY_COMPRESSED
Background Papers
6. PHASE 1 CONTAMINATED LAND ASSESSMENT_COMPRESSED
Background Papers
7. CONSTRUCTION TRAFFIC MANAGEMENT PLAN
Background Papers
8. DAYLIGHT SUNLIGHT REPORT
Daylight and Sunlight assessment
9. FLOOD RISK ASSESSMENT
Flood risk assessment
ACK-GENERAL LETTER (G/P/C)
Background Papers
APPLICATIONFORMREDACTED
Application Form
BUILDING CONTROL COMMENT
Other
CNSLT-CONSULTEE CLOUD STD
Background Papers
CNSLT-CROSS LONDON RAIL LINKS 1&2
Background Papers
CNSLT-CROSS LONDON RAIL LINKS 1&2
Background Papers
CNSLT-LA SOCIETY
Background Papers
CNSLT-LA SOCIETY
Background Papers
CNSLT-LA SOCIETY
Background Papers
ECNSLT-INTERNAL CONSULTS
Background Papers
ECNSLT-INTERNAL CONSULTS
Background Papers
ECNSLT-INTERNAL CONSULTS
Background Papers
ECNSLT-INTERNAL CONSULTS
Background Papers
FLOOD AUTHORITY RESPONSE
Consultee Comment
NEIGHBOUR NOTIFICATION LETTER (21D)
Background Papers
RECEIPT OF APPLICATION
Other
SITE NOTICE 21 OR 28 DAYS IF T&C APPL.
Background Papers
TFL CROSSRAIL 1 COMMENTS
Other
TFL CROSSRIAL 2 COMMENTS
Other
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.