← City of Westminster

Status

Pending Listed building
Received
18 Dec 2025
New homes
0

Full proposal

Internal reconfiguration of Flat B, including new fittings, fixtures, services, and finishes throughout; alterations to staircase landings with replacement balustrades and handrails; installation of new timber-framed slimline double-glazed sash windows in place of modern units; retention of historic window frames with replacement slimline double-glazing; minor internal layout adjustments, including relocation of the powder room and removal of the secondary lift; replacement of modern doors with raised-height openings; installation of new fireplaces in the Drawing Room and Principal Bedroom; introduction of underfloor heating throughout; together with associated internal and external works. (Linked to 26/00883/FULL)

Documents

Drawing
Archived · Original link
Drawing
Archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment View on council portal