← Back to London Borough of Camden
Status
REGISTERED
Change of use
Full Proposal
Change of use from office and retail (Class E) to hotel (Class C1), replacement of windows, alterations to shopfronts, and removal of external escape stair.
Documents
1 x Response CGCA
Consultation Response
1543_001_Location Plan_REV_-.pdf
M3 Document
1543_009_Existing Level -1_REV_-.pdf
Existing Drawing
1543_010_Existing Level 0_REV_-.pdf
Existing Drawing
1543_011_Existing Level 1_REV_-.pdf
Existing Drawing
1543_012_Existing Level 2_REV_-.pdf
Existing Drawing
1543_013_Existing Level 3_REV_-.pdf
Existing Drawing
1543_014_Existing Level 4_REV_-.pdf
Existing Drawing
1543_015_Existing Level 5_REV_-.pdf
Existing Drawing
1543_016_Existing Level 6_REV_-.pdf
Existing Drawing
1543_017_Existing Level 7_REV_-.pdf
Existing Drawing
1543_018_Existing Level 8_REV_-.pdf
Existing Drawing
1543_019_Existing Level 9_REV_-.pdf
Existing Drawing
1543_020_Existing Level 10_REV_-.pdf
Existing Drawing
1543_025_Existing Elevations 1_REV_-.pdf
Existing Drawing
1543_026_Existing Elevations 2_REV_-.pdf
Existing Drawing
1543_027_Existing Sections_REV_-.pdf
Existing Drawing
1543_109_Proposed Level -1_REV_A.pdf
Proposed Drawing
1543_110_Proposed Level 0_REV_A.pdf
Proposed Drawing
1543_111_Proposed Level 1_REV_A.pdf
Proposed Drawing
1543_112_Proposed Level 2_REV_A.pdf
Proposed Drawing
1543_113_Proposed Level 3_REV_A.pdf
Proposed Drawing
1543_114_Proposed Level 4_REV_A.pdf
Proposed Drawing
1543_115_Proposed Level 5_REV_A.pdf
Proposed Drawing
1543_116_Proposed Level 6_REV_A.pdf
Proposed Drawing
1543_117_Proposed Level 7_REV_A.pdf
Proposed Drawing
1543_118_Proposed Level 8_REV_A.pdf
Proposed Drawing
1543_119_Proposed Level 9_REV_A.pdf
Proposed Drawing
1543_120_Proposed Level 10_REV_A.pdf
Proposed Drawing
1543_125_Proposed Elevations 1_REV_-.pdf
Proposed Drawing
1543_126_Proposed Elevations 2_REV_-.pdf
Proposed Drawing
1543_127_Proposed Sections_REV_-.pdf
Proposed Drawing
1543_4.01_002_Point A Holborn_DAS_REV_B-1-5.pdf
M3 Document
1543_4.01_002_Point A Holborn_DAS_REV_B-11-20.pdf
M3 Document
1543_4.01_002_Point A Holborn_DAS_REV_B-21-30.pdf
M3 Document
1543_4.01_002_Point A Holborn_DAS_REV_B-31-40.pdf
M3 Document
1543_4.01_002_Point A Holborn_DAS_REV_B-41-50.pdf
M3 Document
1543_4.01_002_Point A Holborn_DAS_REV_B-51-57.pdf
M3 Document
1543_4.01_002_Point A Holborn_DAS_REV_B-6-10.pdf
M3 Document
Ait quality assessment
M3 Document
Application Form (No Personal Data)
Application Form
Cover Letter.pdf
M3 Document
Delivery and Servicing Plan.pdf
M3 Document
Energy Assessment
M3 Document
Flood risk assessment and drainage strategy
M3 Document
H_Hotel Management Plan.pdf
M3 Document
HK London Marketing Report - Northumberland House December 2025.pdf
M3 Document
Northumberland House Preliminary Plant Noise Assessment_1.0.pdf
M3 Document
Outline Travel Plan.pdf
M3 Document
Planning Statement.pdf
M3 Document
Point A Holborn - Draft Construction Management Plan Pro-forma_V2.pdf
M3 Document
R2 Issue 2 - RAAG Holborn London - Planning Fire Statement Form.pdf
M3 Document
Statement of community involvement
M3 Document
Transport Assessment.pdf
M3 Document
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.