Erection of workshop/office and store (for private use)
Highland Council
highland · GSS S12000017
Recent applications
The most recent records we hold for this council (up to 200).
Extensions to front and rear
Extension to front, rear and internal alterations
Extension to dwelling
Painting, installation of wall lights and signage
Alterations and extension to office building, extension of car park, installation of solar panels, and installation of 3no. EV chargers
Use of property as short term letting unit
Alterations, removal of porch extension and erection of two storey replacement extension
Erection of house, formation of access, installation of septic tank and soakaway
Erection of house, formation of access, installation of septic tank and soakaway
Replacement door on rear elevation
Formation of temporary workers accommodation including 26no. residential units, 2no. offices, 1no. canteen, 1no. toilet block, 1no. generato...
Siting of 4no. pods for short-term letting use and ancillary works
Erection of croft house, upgrading of existing access and ancillary infrastructure
Erection of two detached single-storey outbuildings within the curtilage of a dwellinghouse, comprising a garage and a garden cabin. Each bu...
Erection of house, garage and formation of vehicular access
Installation of external escape stair
Use of property as short term letting unit
Erection of building for storage (Retrospective)
Formation of 2no temporary accesses to A835 (HVDC Beauly to Arnis Lot 3 Project)
Garage conversion and erection of garage
Extension and alterations to car park
Use of property as short term letting unit
Use of property as short term letting unit
Use of property as short term letting unit
Erection of house (Retrospective)
Use of property as a short term letting unit
Demolition of existing porch and construction of extension
Internal alterations
Alterations and raising of roof
Installation of signage
Erection of annexe for short term letting unit
Installation of disabled access aluminium ramp with GRP non slip insert panels bolted to existing walkway (retrospective)
Change of use from office to flat
Use of property for short term let
Use of property as short term letting unit
Change of use from annexe to short term letting unit; formation of wall and hardstanding (retrospective)
Erection of agricultural building
Formation of agricultural access (Class 18)
Erection of agricultural building (class18)
Erection of house, installation of private drainage system and formation of access
Erection of extension
Formation of 3no temporary accesses to A835 (HVDC Beauly to Arnis Lot 3 Project)
Formation of 3no temporary accesses to A835 (HVDC Beauly to Arnis Lot 3 Project)
Formation of 3no temporary accesses to A835 (HVDC Beauly to Arnis Lot 3 Project)
Take down 2 extensions, erect new extension and alterations
Erection of house and letting pod with associated car parking and drainage
Demolition of garage and erection of house
Alterations and rear extension, creation of short-term let accommodation and formation of accessible parking space
Siting and operation of mobile sauna
Erection of agricultural building, siting of polytunnel and formation of access and hardstanding (Class 18)
Erection of workshop and formation of self contained living unit
Alterations to hotel and installation of pods to form 55no. letting bedrooms, facade upgrade, new wall, new pergolas and formation of 44no. ...
Use of property as guest house
Alterations and extension
Causeymire Wind Farm - The Proposed Development would comprise the full repowering of the existing Causeymire Wind Farm to include the remov...
EIA Screening Request - Installation of a feed system, including ten silos of 1.7m wide by 2.5m long by 1.8m high, situated on the walkway o...
Erection of house (renewal of planning application 23/01311/PIP)
Change of use from annexe (Squirrel End) to dwellinghouse
Erection of extension and detached garage
Erection of house and formation of access
Erection of house and formation of access
Alteration of an existing access/track for vehicular access for forestry timber extraction Class 22
Use as short term let and house
Change of use from domestic annexe to short term holiday let
Change of use from boat storage & repair shed to small scale oyster processing facility, replacement windows, change of existing external do...
Change of use to garden ground
Change of Use from open space to domestic garden
Permanent siting of 10 wigwam holiday pods
Alterations and rear extension, creation of short-term let accommodation and formation of accessible parking space
Application to form overspill car park in existing garden ground
Siting of pod for short term letting purpose
Change of use of house to short term letting and extension
Formation of a battery storage facility with a capacity of up to 19.8MW and associated infrastructure
Use of property as short term letting unit
Part change of use of Community Space to Café
Installation of wall mounted EV charging point
Partial conversion of garage to additional accommodation (family use)
Erection of house (Renewal of 23/00482/PIP)
Installation of 4 lighting columns
Dulsie Wood Wind Farm - Erection and operation of a wind farm for a period of 40 years, comprising up to 9 wind turbines with a maximum blad...
Alterations and extension
Removal and re-erection of porch
Replacement windows (retrospective)
Alter and extend existing openings, form new entrance, demolish existing conservatory, fit velux skylights, fit solar panels and replace exi...
Alterations and extensions
Formation of ancillary accommodation and short-term let
Erection of annexe with garage for short term letting use
Erection of agricultural building (class18)
Erection of ancillary outbuilding
Formation of storage yard and siting of 27no. storage containers
Erection of dwelling house, siting of residential caravan for duration of build and associated works
Formation of site compound and siting of modular office building for temporary period of 3 years
Erection of polycrub (Class 18)
Erection of garage and gym/home office building
Erection of agricultural building (Class 18)
Formation of access tracks
Construction of a new timber ramp to permit safe wheelchair access to the property
Erection of extension
Alteration and extension
Alterations and extension
Installation of decking. Internal and external alterations to house.
Erection of house, formation of access, installation of septic tank and soakaway
Erection of 2no. houses
Alterations to access track
Proposed mountain toboggan track and associated structures, buildings, platforms, landscaping and infrastructure works.
Erection of house, garage and associated services
Upgrade of the existing Canisp Road to 3.0m wide including the addition of a 2m footpath, two passing places and the formation of Area A2 ac...
Change of use from domestic annexe to short term holiday let and alterations
Repair works to roof, attic modifications, installation of wood burning stove
Erection of house, shed and formation of access
Change of use of land to community use. Retrospective erection of yurt, sheds, portaloo and polytunnel (amended proposal 25/04143/FUL)
Alterations to ground levels and formation of hardstanding for agricultural use
Widen the running surface of the A838 public road at two corners to accommodate delivery of turbine blade components to the consented Sallac...
Erection of replacement house
Construction of access track, area of hardstanding and associated drainage
Extension to dormer and conversion of outbuilding to home office
Use of property as short term letting unit
Part change of use of dwelling to short term letting unit
Installation of rooflight, enlargement of existing rooflight
Installation of rooflight, enlargement of existing rooflight and siting of bike shed
Erection of 100m high met mast (renewal of 24/01786/FUL)
Replacement of flat roof of sunroom, erection of extension
Replacement septic tank and outfall
Alterations to ground and first floor fireplaces to fit wood burning stoves
Demolition of existing derelict cottage and erection of replacement dwelling
Erection of house (renewal of 22/02570/FUL)
Use partly as guest house
Change of use from House to Guest House
Alterations & canopy extension
Use of property as short term letting unit
Erection of house (renewal of 22/05376/PIP)
Change of use of existing store to hostel accommodation as extension to existing hostel (retrospective)
Siting of private holiday pod
Erection of 2no. agricultural sheds and polyroom for agricultural purposes (Class 18)
Erection of agricultural building (Class 18)
Fasnakyle to Bingally 132kV overhead line connection
Change of use of office to cafe
Phase 2 - Proposed adjustments to the road and footways serving replacement housing
Proposed borrow pit and associated ancillary works
Proposed borrow pit and associated ancillary works
Erection of extension
Erection of agricultural store (class 18)
EIA screening opinion - New 132 kilovolt (kV) overhead line (OHL) supported by trident steel poles, between the proposed Tomchrasky Wind Far...
Siting of portal office container & erection of shed for Class 5/6 use
Renovation and extension of the Dores Inn, new bakery (incorporating cafe/shop, public toilets and beach changing facilities), service build...
Installation of doors, window and extraction vents (retrospective)
Installation of Solar PV
Simplified S37 Notification - New connection at Taagan, Kinlochewe, Achnasheen. Proposed new 3 span spur of 33kv Overhead Line with associat...
Conversion of garage to form self contained residentail unit (family use and short term letting purposes)
Alterations and extension
Erection of house and formation of parking area (renewal of 23/00521/FUL)
Siting of 2 holiday letting units
Use of flat for short term letting
Erection of annexe
Alterations and erection of extensions
Existing use of property as a short term letting unit
Change of use to camp site including the erection of a sanitation block and associated infrastructure
Extension of existing quarry, for the extraction of approx 800,00 tonnes of sand and gravel. All grading and storage of material using exist...
Subdivide retail unit to form 2no. units, erect extension to rear to form storage and welfare areas
Slickly Wind Farm Redesign - construction and operation of a wind farm comprising 7 turbines with maximum tip height of 200m with associated...
Erection of replacement garage
Use of building as agricultural shed and occassional events venue; siting of portable building; installation of drainage infrsatructure
Widen a hairpin bend on a private access road
Erection of house within garden ground
Erection of dwelling house
Installation of solar PV array and associated works
Erection of self contained living unit (ancillary use)
Formation of glamping site comprising 6no timber glamping pods, parking area, paths and drainage infrastructure
Change of use from office/surgery to short term letting unit
Erection of dwelling house and access track
Part demolitions, alterations and extension to existing building to provide multi-purpose events space, relocation of timber shed, siting of...
Erection of 2no. storage sheds, formation of hardstanding and parking areas and extension of access tracks
Conversion of steading to house
Formation of croft access
Matters Specified in Conditions 1-2i, 2k-2t, 3-4, 6-7, 10-11, 13-15, 17-19, 21-22, 24, 28 (19/04213/PIP), Phase 2 of Balloch Farm (Erection ...